KE Electricity Modernization Project

国别:肯尼亚行业:能源 阶段:已关闭 金额:2.0 亿美元 批准:
一句话结论

这是一个位于肯尼亚的能源类海外投资项目,当前阶段为已关闭,批准金额 2.0 亿美元,批准日期 2015-03-31,由国际多边开发机构提供资金。项目编号 P145104。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
肯尼亚(Kenya)
行业
能源
项目阶段
已关闭
批准金额
200,000,000 美元(约 2.0 亿美元)
批准日期
2015-03-31
项目编号
P145104
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The project development objectives for the Electricity Modernization Project for Kenya are: (a) to increase access to electricity; (b) to improve reliability of electricity service; and (c) to strengthen KPLC’s financial situation. The project is comprised of four components. The first component, improvement in service delivery and reliability, is made up of three subcomponents: i) upgrade of the supervisory control and data acquisition/energy management system, ii) distribution system enhanced flexibility, and iii) enhance maintenance practices to improve the reliability of electricity supply. The objective of the second component, the revenue protection program, is to permanently protect the revenues that KPLC receives from sales to large and medium customers, ensuring that all users in that high value segment are systematically billed according to accurately metered consumption and thus reduce non-technical losses. The component will include: (i) creation of one or more Metering Control Centers (MCCs) and investments in IT infrastructure needed to operate them; (ii) incorporation of state-of-the-art Meter Data Management software and training of staff in the MCCs in its proper use; and (iii) supply and installation. The third component, the electrification program, will support the government’s objective of 70 percent household connectivity by 2018 by providing grant financing for the connection of new households thus introducing a more cost-effective and suitable source of funding for electrification investments. There are two sub-components within this component: i) peri-urban electrification will finance the design, materials and construction works required to electrify all households and businesses in high population density peri-urban areas located close to existing electricity networks, ii) off-grid electrification will support the implementation of off-grid electrification solutions in areas whose connection to the national grid is not viable in the short and medium term. Electrification of those areas will be implemented through mini-grids supplied preferably by hybrid generation systems. Finally, the fourth component, technical assistance and capacity building will finance consultancy services, feasibility studies for new investments, training and other activities to support, among other: i) Preparation of the National Electrification Strategy, ii) detailed national technical specifications and standardization, iii) regulations for enforcing quality on electricity service delivery, iv) project preparation support for feasibility studies for new investment as required and project monitoring and evaluation, and v) training and capacity building.

项目编号 P145104 · 入库编号 7f97696a0193

同国别其他在执行项目

项目名称金额批准日期
Kenya Secondary Education Equity and Quality Improvement Program5.4 亿美元2024-10-17
First Kenya Fiscal Sustainability and Resilient Growth9.0 亿美元2024-05-30
Building Resilient and Responsive Health Systems2.0 亿美元2024-03-13
Kenya Green and Resilient Expansion of Energy (GREEN) Program Phase 2 Project1.5 亿美元2023-12-27
Kenya Water, Sanitation, and Hygiene Program2.5 亿美元2023-12-20

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。