Fourth East West Highway Improvement Project

国别:格鲁吉亚行业:道路 阶段:已关闭 金额:7500 万美元 批准:
一句话结论

这是一个位于格鲁吉亚的道路类海外投资项目,当前阶段为已关闭,批准金额 7500 万美元,批准日期 2013-05-09,由国际多边开发机构提供资金。项目编号 P130413。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
格鲁吉亚(Georgia)
行业
道路
项目阶段
已关闭
批准金额
75,000,000 美元(约 7500 万美元)
批准日期
2013-05-09
项目编号
P130413
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objectives of the Fourth East West Highway Improvement Project for Georgia are: (i) to contribute to the gradual reduction of road transport costs and to improve road safety along the section upgraded under the project; and (ii) to strengthen the capacity of the Roads Department (RD) and the Ministry of Regional Development and Infrastructure (MRDI) to plan and manage the road network and improve road traffic safety. The project has four components. The first component is improvement and asset management of the East-West highway. It has following five sub-components: (i) upgrading of existing East-West highway through the construction of a 2-lane dual carriageway from Agara to Zemo Osiauri; (ii) maintenance of the E60 2-lane dual carriageway between Natakhtari and Ruisi; (iii) civil works to improve road safety and access roads on the existing East-West highway between Natakhtari and Ruisi (67km) and along the existing E60 alignment between Ruisi and Chumateleti (44km); (iv) environmental improvement measures along completed sections of the E60 highway between Natakhtari and Ruisi (67km); and (v) construction supervision and quality assurance services. The second component is institutional strengthening. This component provides for the financing of activities to further deepen institutional strengthening efforts being carried out under ongoing bank supported projects. The activities are as follows: (a) institutional strengthening of the MRDI to help the following activities: review and updating of road sector strategy, support to the MRDI to improve road safety management capacity, support to the MRDI to improve the operating environment for the local construction industry, and measures to improve manpower planning and development in MRDI; (b) institutional strengthening of the RD to help organizational efficiency improvement and manpower planning and development measures, and development of a strategic roadmap for the development and implementation of Intelligent Transport Systems (ITS) along the East West highway corridor, from Tbilisi to Turkish border. The third component is preparation of designs and supporting studies for future projects for the development of the East-West highway. This component will finance activities for the definition and design of civil works included in component A of the proposed project and preparatory studies for the future westward upgrading of the E60. The planned activities include: (1) study to define the scope of the maintenance interventions along some upgraded sections of the E60 2-lane dual carriageway e.g. Natakhtari to Ruisi (67 kilometers); (2) road safety improvement studies and designs; (3) update of feasibility studies and undertaking of preliminary engineering design of new Rikoti tunnel and 60km of highway between Chumateleti and Argveta; and (4) detailed design of the new tunnel at Rikoti, preparation of bidding documents and independent review of all technical and safety provisions. The fourth component is project management. This component had two sub-components: implementation support to RD; and financial audits and project monitoring and evaluation services.

项目编号 P130413 · 入库编号 80885021f110

同国别其他在执行项目

项目名称金额批准日期
Enhancing Energy Security through Power Interconnection and Renewable Energy Program3500 万美元2024-05-21
Georgia Resilient Agriculture, Irrigation, and Land Project7500 万美元2023-03-24
Kakheti Connectivity Improvement Project1.1 亿美元2022-03-22
Georgia Human Capital Program4.0 亿美元2022-03-22
Georgia Relief and Recovery for Micro, Small, and Medium Enterprises1.0 亿美元2021-05-11

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。