Ghana Energy Sector Transformation Initiative Project
一句话结论
这是一个位于加纳的能源类海外投资项目,当前阶段为已关闭,批准金额 2000 万美元,批准日期 2018-07-13,由国际多边开发机构提供资金。项目编号 P163984。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 加纳(Ghana)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 20,000,000 美元(约 2000 万美元)
- 批准日期
- 2018-07-13
- 项目编号
- P163984
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Energy Sector Transformation Initiative Project for Ghana is to strengthen the capacity of the energy sector to implement sector reforms, and improve energy sector planning and coordination in Ghana. The project has five components: (a) Management of energy sector financial flows; (b) Sector planning and coordination; (c) Energy access; (d) Natural gas; and (e) Project management. First component, Management of energy sector financial flows will assist in addressing the financial viability of the energy sector by improving revenue management at sector level, improving revenue collection at the utilities’ level, improving organizational structures, and strengthening the power companies’ operational and financial management (FM) functions. Second component, sector planning and coordination is to enhance planning and coordination across the energy sector, this component will assist the Government to design effective institutional arrangements with clear mandates for the regulatory institutions in the energy sector, conduct technical studies on the sector including electricity sector assessment and a gas sector assessment; Third component, energy access has three activities: (a) conducting feasibility and investment planning studies for grid extension and off-grid electrification to reach the Government’s goal for universal electrification by 2030; (b) preparing a strategy for increasing access to safe clean cooking as committed under SDG 7; and (c) conducting studies to upgrade NEDCo’s sub-transmission, distribution and operational systems to improve its operational efficiency; Fourth component, natural gas includes three activities: (a) development of a strategy for balancing natural gas demand and supply; (b) review of WAGP treaties and operation; and (c) support for GNPC in their role as gas aggregator, as well as GNGC and other gas sector agencies and institutions; Fifth component, project management will finance the engagement of consultants to handle the required fiduciary, monitoring, reporting, and coordinating responsibilities. It will also finance the operating costs of the PIU, required project management, consultations and coordination workshops, and the development and implementation of a communications strategy for the energy sector.
项目编号 P163984 · 入库编号 8162875dae8b
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Additional Financing to GAMA Sanitation and Water Project | 1.6 亿美元 | 2024-08-08 |
| Ghana Energy Sector Recovery Program | 2.5 亿美元 | 2024-06-12 |
| Ghana Financial Stability Project | 2.5 亿美元 | 2024-05-30 |
| First Resilient Recovery Development Policy Financing | 3.0 亿美元 | 2024-01-23 |
| Ghana Tree Crop Diversification Project | 2.0 亿美元 | 2023-06-23 |
同行业其他项目
- First Low-Carbon Energy Programmatic Development Policy Loan 2023-06-29
- Second Additional Financing for Dasu Hydropower Stage I Project 2024-06-10
- Tarbela Fourth Extension Hydropower Project 2012-03-20
- Vishnugad Pipalkoti Hydro Electric Project 2011-06-30
- Pumped Storage Technical Assistance Project 2011-05-26
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。