Power System Reliability and Efficiency Improvement Project
一句话结论
这是一个位于孟加拉国的能源类海外投资项目,当前阶段为在执行,批准金额 5900 万美元,批准日期 2017-04-26,由国际多边开发机构提供资金。项目编号 P159807。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 59,000,000 美元(约 5900 万美元)
- 批准日期
- 2017-04-26
- 项目编号
- P159807
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Power System Reliability and Efficiency Improvement Project for Bangladesh is to improve the reliability and efficiency of the power system in Bangladesh through optimization of dispatch operation. The project comprises of three components. The first component, technical assistance consists of two sub-components: (i) primary frequency control trials and training for Power Grid Company of Bangladesh (PGCB) and National Load Dispatch Centre (NLDC) engineers and operators on modern, state‐of‐the‐art frequency control, and dispatch protocols; and (ii) capacity building and institutional review to: (i) acquaint NLDC staff with modern control theory, practical aspects of regulating frequency in real‐time through governor response as well as secondary control, and (ii) build power system dynamic modeling capability using power system simulation for engineers (PSSE). The second component, operational enhancements consists of three sub-components: (i) integration of generators to the NLDC’s supervisory control and data acquisition (SCADA) and energy management system (EMS) system; (ii) upgrading and modernization of the NLDC SCADA and EMS software; and (iii) optimization software for dispatch. The third component, removal of transmission bottlenecks and improvement of voltage quality consists of two sub-components: (i) the upgrade (by re‐conducting with higher capacity conductors) of selected congested 132 kV and 230 kV lines to address existing bottlenecks and enhance system transfer capability; and (ii) dynamic line rating (DLR)12 to improve utilization of limited transmission capacity on 400 km of six critical transmission lines identified by PGCB.
项目编号 P159807 · 入库编号 9233e9295932
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12