Rural Electrification Phase II Project of the Rural Electrification (APL) Program
一句话结论
这是一个位于老挝的能源类海外投资项目,当前阶段为已关闭,批准金额 2000 万美元,批准日期 2010-01-12,由国际多边开发机构提供资金。项目编号 P110978。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 老挝(Lao People's Democratic Republic)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 20,000,000 美元(约 2000 万美元)
- 批准日期
- 2010-01-12
- 项目编号
- P110978
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Second Phase of the Rural Electrification Project for Lao are to: (a) increase access to electricity of rural households in villages of project provinces; and (b) further improve the financial performance of Electricite du Laos (EdL). There are two components to the project, the first component being EdL. The EdL component will comprise the following subcomponents: grid extension, loss reduction, information technology system and financial management, safeguards capacity building, and demand-side management and energy efficiency program. Finally, the second component is the Ministry of Energy and Mines (MEM). The MEM component will comprise the following subcomponents: off-grid investment program, institutional strengthening, alternative rural electrification delivery models, rural electrification master plan and database, and organizational strengthening of MEM.
项目编号 P110978 · 入库编号 c39b21c36c9c
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Lao PDR Climate Resilient Road Connectivity Improvement Project | 5600 万美元 | 2024-09-30 |
| Lao Health and Nutrition Services Access Project II | 3900 万美元 | 2024-02-21 |
| Reducing Rural Poverty and Malnutrition Project II (RRPM II) | 3700 万美元 | 2023-11-30 |
| Community Livelihood Enhancement And Resilience | 4500 万美元 | 2023-06-15 |
| Power Distribution Improvement Project | 5100 万美元 | 2023-06-01 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。