Secondary Cities Urban Mobility and Development Project
一句话结论
这是一个位于布基纳法索的港口类海外投资项目,当前阶段为在执行,批准金额 2.0 亿美元,批准日期 2023-09-28,由国际多边开发机构提供资金。项目编号 P177918。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 布基纳法索(Burkina Faso)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 200,000,000 美元(约 2.0 亿美元)
- 批准日期
- 2023-09-28
- 项目编号
- P177918
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Secondary Cities Urban Mobility and Development Project for Burkina Faso is to improve urban mobility, access to basic services and economic opportunities, and strengthen institutional capacity for urban management in selected secondary cities in Burkina Faso. The project comprises of five components. The first component, urban mobility services and infrastructure will support the improvement of urban mobility in the three cities by financing the rehabilitation and upgrading of urban roads and road safety improvements. It consists of following subcomponents: (i) urban mobility services; (ii) urban mobility infrastructure; and (iii) road safety. The second component, urban infrastructure and basic services will focus on improving the living condition of the population through the provision of safe, resilient, green, inclusive urban infrastructure, and socioeconomic services in the three cities using a spatial and people-centered approach that also considers vulnerability to climate shocks (e.g., floods and extreme temperatures). It consists of following sub-components: (i) urban infrastructure for better living conditions; (ii) urban infrastructure and capacity building for economic opportunities; and (iii) prevention, monitoring, and mitigation of sexual exploitation and abuse, (SEA) and gender-based violence (GBV). The third component, institutional strengthening will update and improve existing urban mobility and urban development planning frameworks to ensure the sustainable and climate-resilient use of urban land along selected corridors, as well as institutional strengthening, and capacity building for urban development at central (including the General Directorate of Cooperation - DGCOOP) and local levels. The fourth component, project management consists of following sub-components: (i) project management; and (ii) monitoring and evaluation (M and E). the fifth component, contingent emergency response component (CERC) will draw from the uncommitted resources under the Project from other Project components to cover emergency response.
项目编号 P177918 · 入库编号 c54d4b4b0d39
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Human Capital Protection Project | — | 2024-09-19 |
| Burkina Faso Water Security Project (BFWSP) | 1.5 亿美元 | 2024-06-07 |
| Burkina Faso Digital Acceleration Project | 1.5 亿美元 | 2024-01-23 |
| Burkina Faso Local Governance for Basic Services & Resilience Program | 1.5 亿美元 | 2023-05-08 |
| Burkina Faso Livestock Resilience and Competitiveness Project | 1.5 亿美元 | 2023-05-08 |
同行业其他项目
- Dar es Salaam Urban Transport Improvement Project 2017-03-08
- Douala Urban Mobility Project 2022-06-02
- Karachi Mobility Project 2019-06-27
- Support to the National Urban Transit Program Project 2011-07-21
- Central Africa Regional Waterways Project 2023-06-29
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。