Kali Gandaki A Hydropower Plant Rehabilitation Project (KGAHPRP)

国别:尼泊尔行业:能源 阶段:已关闭 金额:2726 万美元 批准:
一句话结论

这是一个位于尼泊尔的能源类海外投资项目,当前阶段为已关闭,批准金额 2726 万美元,批准日期 2013-05-15,由国际多边开发机构提供资金。项目编号 P132289。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
尼泊尔(Nepal)
行业
能源
项目阶段
已关闭
批准金额
27,260,000 美元(约 2726 万美元)
批准日期
2013-05-15
项目编号
P132289
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objectives of the Kali Gandaki a Hydropower Plant Rehabilitation Project for Nepal are to improve the reliability of power supply through rehabilitation and safety measures and to improve the response capacity of Nepal in case of an emergency. The project has four components. The first component is civil works. It consists of following three sub-components: (i) head works modifications; (ii) improving dam safety monitoring and instrumentation; and (iii) maintenance works. The second component is electro-mechanical works. This component consists of mechanical and electrical works divided into two sub-components, mechanical and electrical works. The third component is technical assistance and capacity-building. This component consists of the following five sub-components: (a) consulting firm; (b) asset management; (c) safeguard implementation; (d) capacity building; and (e) catchment area treatment plan. The fourth component is contingent emergency response. This component will draw resources from the unallocated expenditure category and allow the Government of Nepal (GoN) to request the Bank to re-categorize and reallocate financing from other project components to partially cover emergency response and recovery costs. This component can also be used to channel additional funds available as a result of the emergency. This component does not have results indicator in the results framework.

项目编号 P132289 · 入库编号 fdcfecb7ab63

同国别其他在执行项目

项目名称金额批准日期
NEPAL SECOND GREEN, RESILIENT, AND INCLUSIVE PROGRAMMATIC DEVELOPMENT POLICY CREDIT1.0 亿美元2024-12-12
Nepal Disaster Resilience Development Policy Credit with Cat DDO (NDRC)1.5 亿美元2024-10-08
Nepal Finance for Growth DPC (3 of 3)8000 万美元2024-05-06
Second Fiscal Policy for Growth, Recovery and Resilience Development Policy Credit1.0 亿美元2024-02-29
Provincial and Local Roads Improvement Program - Phase 11.0 亿美元2024-02-29

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。