中项目网图形标 中项目信息网海内+海外版

Mekong Delta Region Urban Upgrading Project

国别:越南行业:港口 阶段:已关闭 金额:2.9 亿美元 批准:
一句话结论

这是一个位于越南的港口类海外投资项目,当前阶段为已关闭,批准金额 2.9 亿美元,批准日期 2012-03-22,由国际多边开发机构提供资金。项目编号 P113904。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
越南(Vietnam)
行业
港口
项目阶段
已关闭
批准金额
292,000,000 美元(约 2.9 亿美元)
批准日期
2012-03-22
项目编号
P113904
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objectives of the Vietnam National Urban Upgrading Project will be to improve the living conditions of the urban poor in selected cities in the Mekong Delta Region; improve urban management capacity and planning in those same cities; and strengthen knowledge and urban management capacity at the national level. There are five components to the project. The first component is tertiary infrastructure upgrading in low income areas. This component includes provision of support to upgrade tertiary infrastructure in low income areas including: (i) construction, rehabilitation, and upgrading of roads and lanes; (ii) construction and rehabilitation of drains; (iii) improvements to environmental sanitation by rehabilitating or constructing public sewers, fostering the construction of septic tanks, providing access to septic management services, and house connections to public sewers; (iv) improvement of water supply including the installation of meter connections; (v) provision of metered house connections for electricity and public lighting in residential lanes and streets; and (vi) construction and rehabilitation of social infrastructure facilities such as schools, markets, community halls, and green spaces. The second component is supporting primary and secondary infrastructure. This component includes provision of support to improve primary and secondary infrastructure serving and benefiting Low Income Area (LIAs) including: (i) roads; (ii) water supply lines; (iii) drains and sewers; (iv) electrical power lines; (v) river and canal embankments; and (vi) social infrastructure facilities such as schools, markets, community halls, and green spaces. The third component is resettlement sites. This component comprises provision of support to prepare resettlement areas for affected persons, including construction of tertiary, primary, and secondary infrastructure. The fourth component is implementation support and project management. This component will focus on provision of support for project implementation, management, supervision, and monitoring and evaluation, including audits. The fifth component is technical assistance to the ministry of construction to implement National Urban Upgrading Program (NUUP). This component includes provision of support to Ministry of Construction (MOC) for: (i) development of a national urban upgrading program; (ii) designing an operational national urban database on key urban indicators; (iii) formulation of climate change adaptation strategies for coastal cities particularly in the Mekong Delta Region; and (iv)other support for project coordination and implementation.

项目编号 P113904 · 入库编号 c7a4822c1b85

同国别其他在执行项目

项目名称金额批准日期
Southern Waterway Corridors and Logistics Development Project1.1 亿美元2024-06-21
Binh Duong Province's Water Environment Improvement Project2.3 亿美元2024-01-13
Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project1.3 亿美元2023-07-28
Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD2.9 亿美元2020-06-30
Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province1.3 亿美元2020-06-30

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。